Lighting Project Lead Times: Planning Decorative Lighting for Handover

ceiling points, supports and drivers first, then order dates counted back from handover, with slack for delivery and inspection.

  • Spanish alabaster, selected and matched
  • Designed in Bangalore, made in India
  • Finishes and drop set to the room
  • Typically 3 to 4 weeks, shipped worldwide

For a lighting project with a fixed handover, plan backwards from the day the fixtures must be on site. Teeshaa's made-to-order alabaster pieces typically take 3 to 4 weeks, delivery timelines are indicative, and the decisions that cannot wait are the ceiling points, supports and driver locations, which are fixed before the false ceiling closes.

key facts.

  • Made-to-order Teeshaa pieces are typically 3 to 4 weeks; the product page states the lead time.
  • Some smaller pieces and sizes are ready to order online; larger formats and some sizes are made to order on enquiry.
  • Delivery timelines are indicative, and remote areas may take longer or not be available.
  • Check the package on arrival and report visible damage within 48 hours.
  • Ceiling points, supports and driver location must be decided before the false ceiling and electrical first fix.

when does new home lighting design have to be decided?

The decisions that shape the ceiling come first. A ceiling point in the wrong place means reopening finished work once the cove is closed.

A common sequence in Indian homes and fit-outs runs: civil work, electrical first fix alongside ceiling framing, putty and paint, then decorative fittings last. Your contractor's order may differ, so ask for the actual dates. Count back from the day the fixtures must go up; that date, not handover, is your anchor.

which lighting decisions must be fixed before the cove closes?

Five decisions: the position of each ceiling point, the support above it, where the driver sits, the dimmer type, and the position of any fan. Finish can follow, but size and weight must be known to place the support.

  • Ceiling point position. Mark it against the furniture plan, not the room centre.
  • Support. A hung piece needs a support that suits its weight. Confirm the weight with the studio, then ask a structural adviser and a licensed electrician; do not assume the false-ceiling board will carry it. See installing an alabaster chandelier on a false ceiling.
  • Driver location. Teeshaa product pages show the driver as in-canopy or remote. A remote driver needs a space to sit and be reached.
  • Dimmer type. Dimming is available on request. Confirm the type with the studio before the wiring is closed.
  • Fan position. If a fan shares the room, settle where each sits first.

Also measure the finished ceiling height, not the slab. A false-ceiling cove often takes 20 to 30 cm, and apartment ceilings are commonly 2.7 to 3.0 m before that. For tall spaces see lighting a double-height space.

how do ready-to-order and made-to-order pieces change the order date?

Count back from the fixture date by each piece's lead time, plus delivery and slack. Ready-to-order pieces state their lead time on the product page; made-to-order pieces are typically 3 to 4 weeks and start with an enquiry.

ordering mode how it works effect on your order date
Ready to order Bought online from the product page, with tracking details shared where available. Order at least the stated lead time, plus delivery, plus slack, before the fixture date.
Made to order Typically 3 to 4 weeks; the product page states the lead time, and extra processing time may be needed. Order at least that long, plus delivery, plus slack, before the fixture date.
Larger formats, price on request Made to order on enquiry; the studio confirms scale, configuration and timing. Enquire as soon as the layout is fixed, then order once the details are confirmed.
Mixed product For example the Halo Crown Chandelier: the 60 cm Small is ready to order; larger rings are on enquiry. Plan by the size you need, not by the product name.

Orders are processed after payment confirmation, so payment is part of the timeline. For the detail of the two modes, read made-to-order vs ready-to-order lighting.

what does a lighting project timeline look like working back from handover?

Read the table from the bottom up: start with the installation date, subtract delivery, production and slack, and the order and approval dates follow.

milestone when it must be done what to settle
Fixture selection Before ceiling framing Which piece and size goes where, so points and supports can be placed.
Sample approval Before you confirm the order Stone and finish. Trade members can request samples against an active project; others can ask the studio.
Ceiling cut-outs and supports Before the cove closes Point positions, support to a suitable structure, cove depth.
Electrical first fix With the ceiling work Driver space (canopy or remote), dimmer type, fan position.
Order and payment confirmation Lead time plus delivery plus slack before the fixture date Final size, drop, finish and configuration.
Dispatch and delivery Indicative; allow extra for remote areas Where the piece will be stored safely on site.
48-hour inspection On arrival Check the package on arrival, even if installation is later, and report visible damage within 48 hours of delivery with clear photographs or videos.
Installation After paint and finishing work Your electrician, or ask the studio whether its team can install.

how much slack should a lighting project leave?

There is no fixed figure, so leave more than feels necessary: delivery timelines are indicative and made-to-order pieces may need extra processing time. Put the slack in these places.

  • Delivery. Remote areas may take longer or not be available, so confirm your location early.
  • Inspection. Someone must be on site to check the package and report visible damage within 48 hours of delivery.
  • Installation. Book the installer for after paint and finishing work, with room to move the date if the piece arrives late.
  • Late changes. If the ceiling height changes after the order, tell the studio at once, because the drop may need to change.

Approve samples before the order where you can, because made-to-order pieces are not eligible for returns, exchanges or refunds. Sections of multi-part pieces are matched for colour, clouding and transmission, but stone differs block to block, so if separate pieces will sit together, ask the studio about ordering them at the same time. If a festival or occupancy date matters, enquire early.

who installs, and when should you arrange it?

Either your own licensed electrician or, if the studio can offer it, Teeshaa's team. Decide before the order, because it affects the warranty.

Every Teeshaa light carries a one-year warranty against manufacturing defects. It does not cover damage caused by an installation done by anyone other than Teeshaa's team. You may use your own electrician, but then the installation cannot be guaranteed. Ask the studio whether its team can install on your site, and arrange your electrician early if not, so the visit does not fall after the handover. See from enquiry to installation for the full ordering route.

how Teeshaa fits.

Teeshaa designs sculptural alabaster lighting in Bangalore and makes it in its own facilities in India. Its range spans ready-to-order pieces such as the Alabaster Linea Pendant and Totem Pendant Style 1, and larger chandeliers on enquiry.

Approved members of the trade programme, such as architects, interior designers, contractors and developers, can request technical drawings, dimensions, weights, finishes, lead times, electrical information and samples against an active project. Before an order the team reviews scale, drop, sightlines, output, suspension and access. For a one-off, see bespoke commissions. Delivery terms are in the shipping policy.

frequently asked questions.

How early should I order decorative lighting for a handover?

Work back from the day the fixtures must be on site. Made-to-order Teeshaa pieces typically take 3 to 4 weeks and delivery timelines are indicative, so add transit and a margin for inspection and installation. For larger formats, enquire as soon as the layout is fixed, because the studio confirms lead time on enquiry.

Can I order a light before the false ceiling is done?

Yes, and for made-to-order pieces it is often sensible, as long as the ceiling points, supports and driver location are already fixed. Measure the finished ceiling, not the slab, because a cove often takes 20 to 30 cm. If the height may still change, ask the Teeshaa studio before you confirm the order.

What happens if delivery is late for my project handover?

Teeshaa's shipping policy describes delivery timelines as indicative, shares tracking details where available, and notes that remote areas may take longer or not be available. Treat any date as an estimate rather than a commitment. Build slack into the plan, and tell the studio early if a festival or occupancy date is fixed.

Can the studio hold a piece until my site is ready?

Do not plan on a hold unless the Teeshaa studio confirms one. Ask through the contact page, with your handover date and the stage your site has reached. If a hold is not possible, time the order so that the piece arrives shortly before installation, with a margin to check the package and report visible damage within 48 hours of delivery.

Is a bespoke piece on the same timeline as a standard one?

Do not assume so. Teeshaa's typical 3 to 4 weeks is for made-to-order pieces. No typical lead time is stated for bespoke commissions or project-specific adaptations, so ask the studio for timing. If a bespoke piece is part of your lighting project, raise it before ceiling work starts, because it affects the points, supports and drivers that must be fixed early.

Last updated 6 November 2026.

planning a handover date.

Tell the studio your site stage and handover date, and ask what the ordering route looks like for your pieces.